SAN JOAQUIN RIVER
Dissolved Oxygen Total Maximum Daily Load
(SJR DO TMDL) Stakeholder Process

Synthesis of Findings on the Causes and Factors Influencing Low DO in the San Joaquin River Deep Water Ship Channel Near Stockton, CA


(8.1 Meg)
Synthesis Report - Final, March, 2003

G. Fred Lee, PhD, DEE and Anne Jones-Lee, PhD
G. Fred Lee & Associates
El Macero, California
Ph 530 753-9630
Fx 530 753-9956

gfredlee@aol.com
www.gfredlee.com




Website designed by Kevin Wolf and Associates
Webmaster: David Siedband